Power grid
promised $14.3 billionalready out $3.6 billion
Report date 2026-02-01
There is no official island-wide total here. There are dated funds: money promised on paper, money that already left, and money still waiting. The careful total further down counts each federal dollar once and says what it leaves out. Slow is not the same as stolen — that needs an indictment.
Page under review: the numbers are being verified before publishing.
First the money words. Then what each acronym is. Without that, the numbers don’t say much.
Pick a topic above. You see how that fund moves — promised versus what already left — without mixing reports from different years.
Careful total (no double-count): $95.34 billion. Already out $26.98 billion · waiting $42.63 billion · no exit data $25.73 billion.
Portion of the total with no verified exit figure in this table. It splits in two: «waiting» (committed, dated, not yet out) and «no data» (funds like Medicaid, NAP, SLFRF or ESSER whose spending is not measured here). Means unknown here — never «stolen».
Tap a card to see which funds land there.
promised $14.3 billionalready out $3.6 billion
Report date 2026-02-01
awarded $23.4 billionspent $1.8 billion
Report date 2023-06-30
promised $38.9 billionalready out $11 billion
Report date 2026-03-31
awarded $11.94 billionspent $5.52 billion
Report date 2026-08-01
awarded $8.29 billionspent $622.93 million
Report date 2026-08-01
promised $1.82 billionalready out $788.79 million
Report date 2026-09-01
| Label | Amount | Metric | Stage | Report date | Notes |
|---|---|---|---|---|---|
| Grid total obligated (FEMA+HUD+DOE)GAO | $14.3 billion | promised | commitment | 2026-02-01 | #449 |
| Grid total disbursed (FEMA+HUD+DOE)GAO | $3.6 billion | already out | completed | 2026-02-01 | #449 |
| FEMA grid allottedFEMA | $13.2 billion | allotted | federal inflow | 2025-12-01 | #449 |
| FEMA grid obligatedFEMA | $11.1 billion | promised | commitment | 2025-12-01 | #449 |
| FEMA grid disbursedFEMA | $2.7 billion | already out | completed | 2025-12-01 | #449 |
| HUD grid allottedHUD | $2.9 billion | allotted | federal inflow | 2026-02-01 | #449 |
| HUD grid obligatedHUD | $2.3 billion | promised | commitment | 2026-02-01 | #449 |
| HUD grid disbursedHUD | $589 million | already out | completed | 2026-02-01 | #449 |
| DOE grid allottedDOE | $1 billion | allotted | federal inflow | 2026-02-01 | #449 |
| DOE grid obligatedDOE | $900 million | promised | commitment | 2026-02-01 | #449 |
| DOE grid disbursedDOE | $300 million | already out | completed | 2026-02-01 | #449 |
| FEMA PA permanent awarded (Irma/María/quakes)FEMA | $23.4 billion | awarded | commitment | 2023-06-30 | #450 |
| FEMA PA permanent expendedFEMA | $1.8 billion | spent | completed | 2023-06-30 | #450 |
| COR3 María PA obligated (total)COR3 | $38.9 billion | promised | commitment | 2026-03-31 | #455 #411 |
| COR3 María PA disbursed (federal share path)COR3 | $11 billion | already out | completed | 2026-03-31 | #455 #411 |
| COR3 María PA federal share obligatedCOR3 | $35.6 billion | promised | commitment | 2026-03-31 | #411 #455 |
| COR3 María PA permanent (C–G) obligatedCOR3 | $27.9 billion | promised | commitment | 2026-03-31 | #411 |
| COR3 María PA permanent (C–G) disbursedCOR3 | $5.1 billion | already out | completed | 2026-03-31 | #411 |
| COR3 HMGP federal disbursedCOR3 | $169.6 million | already out | completed | 2026-03-31 | #411 |
| HUD CDBG-DR energy grant awarded (B-18-DE)HUD | $1.93 billion | awarded | federal inflow | 2026-02-01 | #409 |
| HUD CDBG-DR energy drawn (8.8%)HUD | $170.73 million | spent | bottlenecked | 2026-08-01 | #409 |
| HUD OIG: energy programs spent (near-zero)HUD | $179,761 | spent | bottlenecked | 2024-07-12 | #410 |
| HUD CDBG-MIT awarded (B-18-DP-72-0002)HUD | $8.29 billion | awarded | federal inflow | 2026-08-01 | #425 |
| HUD CDBG-MIT drawn (7.5%)HUD | $622.93 million | spent | bottlenecked | 2026-08-01 | #425 |
| CDBG budgeted as FEMA cost share (18 grantees, national figure)GAO | $3.7 billion | other | commitment | 2024-12-01 | #432 |
| CDBG FEMA cost share spent (national figure)GAO | $289 million | spent | bottlenecked | 2024-12-01 | #432 |
| FEMA IHP approved (María households)FEMA | $1.34 billion | awarded | completed | 2024-09-27 | #433 |
| FEMA PA grants obligated (DR-4339 page)FEMA | $19.28 billion | promised | commitment | 2024-09-27 | #433 |
| FEMA PA emergency A/B obligated (page)FEMA | $5.24 billion | promised | commitment | 2024-09-27 | #433 |
| FEMA PA permanent C–G obligated (page)FEMA | $13.4 billion | promised | commitment | 2024-09-27 | #433 |
| PRASA CIP totalPRASA | $7 billion | other | pipeline | 2026-02-25 | #451 |
| PRASA CIP under constructionPRASA | $2.3 billion | other | pipeline | 2026-02-25 | #451 |
| PRASA CIP in planningPRASA | $4.7 billion | other | pipeline | 2026-02-25 | #451 |
| EPA SAHFI water allocation (Fiona)other | $213.4 million | allotted | federal inflow | 2026-02-25 | #451 |
| PRASA FEMA FAASt water under constructionPRASA | $2.1 billion | other | pipeline | 2026-06-17 | #452 |
| DOE solar reallot/cancel totalDOE | $715 million | other | admin | 2026-02-01 | #453 |
| DOE Resilient Communities → grid (365M)DOE | $365 million | other | admin | 2025-05-01 | #453 |
| DOE Solar Access cancel (up to 350M)DOE | $350 million | other | admin | 2026-01-01 | #453 |
| Esencia CTPR tourism tax credits authorizedother | $497.7 million | subsidy | admin | 2026-09-01 | #454 |
| Esencia private investment (more than 2B)other | $2 billion | other | pipeline | 2026-07-31 | #458 |
| FOMB emergency reserve ceiling (drought)FOMB | $18.73 million | ceiling | admin | 2026-08-26 | #443 |
| Whitefish Energy contract cancelledother | $300 million | other | waste | 2017-10-29 | #414 |
| Hacienda tax-debt scheme (indictment)other | $3.5 million | indictment | fraud | 2025-10-23 | #428 |
| OCPR R3 vacant reconstructed houseother | $253,139 | other | waste | 2026-04-29 | #426 |
| CARES CRF Puerto Rico Treasury transferTreasury | $2.24 billion | allotted | federal inflow | 2020-04-20 | — |
| ARPA SLFRF / CSFRF territorial (Treasury)Treasury | $2.47 billion | allotted | federal inflow | 2021-05-10 | — |
| ARPA SLFRF municipal / CLFRF (AAFAF)Treasury | $1.55 billion | allotted | federal inflow | 2021-07-20 | — |
| ARPA ESSER III (ARP ESSER) Puerto Rico SEAED | $2.97 billion | allotted | federal inflow | 2021-06-25 | — |
| ARRA 2009 Puerto Rico awarded (OGP snapshot)other | $6.87 billion | awarded | federal inflow | 2011-07-01 | — |
| ACA Sec. 2005 Medicaid add-on (ASPE ~$5.5B)HHS | $5.5 billion | allotted | federal inflow | 2017-01-01 | — |
| USACE BBA 2018 LDRIP Construction (PR)USACE | $2.51 billion | allotted | federal inflow | 2018-07-05 | — |
| ED Restart PR awardED | $589.2 million | awarded | federal inflow | 2024-01-18 | — |
| ED Restart PR drawn (expended)ED | $504 million | spent | completed | 2024-01-18 | — |
| PREPA–COBRA contract value (USAO indictment)other | $1.85 billion | other | admin | 2019-09-10 | — |
| FEMA OIG-20-76 commodity lost visibilityFEMA | $256.84 million | other | waste | 2020-09-25 | — |
| FEMA DR-1552 Jeanne IHP approvedFEMA | $416.5 million | awarded | federal inflow | 2022-12-20 | — |
| FEMA DR-1552 Jeanne PA obligatedFEMA | $41.3 million | promised | commitment | 2022-12-20 | — |
| FEMA DR-1613 floods PA obligatedFEMA | $11.82 million | promised | commitment | 2022-12-20 | — |
| FEMA DR-1798 2008 storms IHP approvedFEMA | $30 million | awarded | federal inflow | 2022-12-20 | — |
| FEMA DR-1798 2008 storms PA obligatedFEMA | $27.63 million | promised | commitment | 2022-12-20 | — |
| FEMA DR-4017 Irene IHP approvedFEMA | $33.47 million | awarded | federal inflow | 2022-12-20 | — |
| FEMA DR-4017 Irene PA obligatedFEMA | $57.09 million | promised | commitment | 2022-12-20 | — |
| FEMA DR-4336 Irma IHP approvedFEMA | $12.95 million | awarded | federal inflow | 2025-02-19 | — |
| FEMA DR-4336 Irma PA obligatedFEMA | $10.99 million | promised | commitment | 2025-02-19 | — |
| PR-ERF / PRERF DOE allottedDOE | $1 billion | allotted | federal inflow | 2026-02-01 | #449 |
| PR-ERF / PRERF DOE obligatedDOE | $925 million | promised | commitment | 2026-02-01 | #449 |
| PR-ERF / PRERF DOE disbursedDOE | $254 million | already out | completed | 2026-02-01 | #449 |
| HUD CDBG-DR Fiona/2022 floods awardedHUD | $166.31 million | awarded | federal inflow | 2023-05-18 | — |
| HUD CDBG-DR Fiona/2022 floods drawnHUD | $50,399 | spent | completed | 2026-08-01 | — |
| WCK FEMA meal contract (Maria)FEMA | $10.08 million | other | completed | 2017-11-07 | — |
| Citgo diesel pledge (50k barrels, no $)other | 50,000 barrels | other | other | 2017-10-03 | — |
| HUD CDBG-DR María first tranche awarded (B-17-DM, housing)HUD | $1.51 billion | awarded | federal inflow | 2018-02-09 | — |
| HUD CDBG-DR María first tranche drawn (79.9%)HUD | $1.2 billion | spent | completed | 2026-08-01 | — |
| HUD CDBG-DR María second tranche awarded (B-18-DP-72-0001)HUD | $8.22 billion | awarded | federal inflow | 2018-08-14 | — |
| HUD CDBG-DR María second tranche drawn (49.6%)HUD | $4.08 billion | spent | pipeline | 2026-08-01 | — |
| HUD CDBG-DR María infrastructure awarded (B-19-DP)HUD | $277.85 million | awarded | federal inflow | 2020-01-27 | — |
| HUD CDBG-DR María infrastructure drawn (23.2%)HUD | $64.55 million | spent | bottlenecked | 2026-08-01 | — |
| HUD CDBG-DR Irma/María total awarded (4 grants)HUD | $11.94 billion | awarded | federal inflow | 2026-08-01 | — |
| HUD CDBG-DR Irma/María total drawn (46.2%)HUD | $5.52 billion | spent | pipeline | 2026-08-01 | — |
| HUD CDBG-DR 2019–2020 earthquakes awarded (B-19-DF)HUD | $36.42 million | awarded | federal inflow | 2021-01-06 | — |
| HUD CDBG-DR 2019–2020 earthquakes drawn (32.7%)HUD | $11.92 million | spent | bottlenecked | 2026-08-01 | — |
| HUD CDBG-DR 2020 disasters (quakes + Isaías) awarded (B-21-DZ)HUD | $184.63 million | awarded | federal inflow | 2022-02-03 | — |
| HUD CDBG-DR 2020 disasters drawn (11.0%)HUD | $20.39 million | spent | bottlenecked | 2026-08-01 | — |
| HUD CDBG-DR as FEMA cost share in PR (ER1): allottedHUD | $500 million | allotted | commitment | 2026-02-01 | #449 |
| HUD CDBG-DR FEMA cost share (ER1): disbursedHUD | $89 million | already out | bottlenecked | 2026-02-01 | #449 |
| COR3 HMGP María obligated (federal)COR3 | $632.6 million | promised | commitment | 2026-03-31 | #411 |
| COR3 portal: María PA obligated (federal share)COR3 | $35.74 billion | promised | commitment | 2026-09-01 | — |
| COR3 portal: María PA disbursedCOR3 | $11.83 billion | already out | completed | 2026-09-01 | — |
| FEMA PA 2020 earthquakes (DR-4473) obligated (federal)FEMA | $1.09 billion | promised | commitment | 2026-09-01 | — |
| FEMA PA 2020 earthquakes (DR-4473) disbursedFEMA | $507.87 million | already out | completed | 2026-09-01 | — |
| FEMA IHP 2020 earthquakes (DR-4473) approvedFEMA | $76.83 million | awarded | completed | 2025-02-19 | — |
| FEMA PA COVID-19 (DR-4493) obligated (federal)FEMA | $161.04 million | promised | commitment | 2026-09-01 | — |
| FEMA PA COVID-19 (DR-4493) disbursedFEMA | $152.8 million | already out | completed | 2026-09-01 | — |
| FEMA PA Fiona (DR-4671) obligated (federal)FEMA | $1.82 billion | promised | commitment | 2026-09-01 | — |
| FEMA PA Fiona (DR-4671) disbursedFEMA | $788.79 million | already out | completed | 2026-09-01 | — |
| FEMA IHP Fiona (DR-4671) approvedFEMA | $649.14 million | awarded | completed | 2026-04-30 | — |
| FEMA HMGP Fiona (DR-4671) obligated (federal)FEMA | $30.71 million | promised | commitment | 2026-09-01 | — |
| FEMA HMGP Fiona (DR-4671) disbursedFEMA | $331,895 | already out | bottlenecked | 2026-09-01 | — |
| FEMA PA 2024 storms (DR-4805) obligated (federal)FEMA | $79.53 million | promised | commitment | 2026-09-01 | — |
| FEMA PA 2024 storms (DR-4805) disbursedFEMA | $22.49 million | already out | completed | 2026-09-01 | — |
| FEMA PA Ernesto 2024 (DR-4850) obligated (federal)FEMA | $81.27 million | promised | commitment | 2026-09-01 | — |
| FEMA PA Ernesto 2024 (DR-4850) disbursedFEMA | $35.52 million | already out | completed | 2026-09-01 | — |
| FEMA Community Disaster Loans to municipalities (María) approvedFEMA | $306.4 million | awarded | federal inflow | 2022-04-30 | — |
| FEMA CDL to municipalities disbursed (forgiven)FEMA | $303.7 million | already out | completed | 2022-04-30 | — |
| CARES CRF spent by PR (through Jun 30, 2021)Treasury | $1.87 billion | spent | completed | 2021-06-30 | — |
| ARPA Capital Projects Fund (Treasury) PR allottedTreasury | $158.31 million | allotted | federal inflow | 2021-09-29 | — |
| CARES ESSER I (Education) PR allottedED | $349.11 million | allotted | federal inflow | 2020-04-23 | — |
| CRRSA ESSER II (Education) PR allottedED | $1.32 billion | allotted | federal inflow | 2021-01-05 | — |
| ACA Sec. 1323 Medicaid (PR) allottedHHS | $925 million | allotted | federal inflow | 2010-03-23 | — |
| BBA 2018 Medicaid for María (PR) allottedHHS | $4.8 billion | allotted | federal inflow | 2018-02-09 | — |
| NAP disaster grant 2017 (USDA) allottedUSDA | $1.27 billion | allotted | federal inflow | 2017-10-26 | — |
| NAP disaster grant 2019 (USDA) allottedUSDA | $600 million | allotted | federal inflow | 2019-06-06 | — |
| ARRA 2009: federal awards to PR recipients (Recovery.gov)other | $2.64 billion | awarded | federal inflow | 2013-03-04 | — |
| ARRA 2009: received by PR recipients (Recovery.gov)other | $2.49 billion | already out | completed | 2013-03-04 | — |
| FHWA Emergency Relief (highways) Irma/María PRDOT | $878.33 million | allotted | federal inflow | 2026-06-18 | — |
| FTA Emergency Relief (public transit) Irma/María PRDOT | $223.51 million | allotted | federal inflow | 2018-05-31 | — |
| Tribute Contracting meal contract (FEMA, terminated; 2025 sentence)FEMA | $155.98 million | other | fraud | 2018-05-18 | — |
| AFICA bond emissions cumulative (1978–2003)other | $5.84 billion | other | completed | 2003-04-16 | #674 |
| AFICA bonds outstanding (Jun 2004)other | $2.15 billion | other | completed | 2004-06-30 | #674 |
| AFICA Coliseo José Miguel Agrelot construction contractother | $122.31 million | other | commitment | 1998-07-16 | #660 |
| AFICA Coliseo BGF credit line ceilingother | $230 million | ceiling | commitment | 2001-01-01 | #660 |
| AFICA Coliseo construction disbursedother | $219.97 million | already out | completed | 2006-04-25 | #660 |
| PRASA CWA plea criminal fine (2006)PRASA | $9 million | other | admin | 2006-06-22 | #663 |
| PRASA CWA plea civil fine (2006)PRASA | $1 million | other | admin | 2006-06-22 | #663 |
| PRASA CWA plea CIP commitment (~$1.7B, 2006 origin)PRASA | $1.7 billion | other | pipeline | 2006-06-22 | #663 |
| PRASA EPA CWA fines (calendar 2004)PRASA | $1.23 million | other | admin | 2004-12-23 | #677 |
| PRASA Salud fines (calendar 2004)PRASA | $2.58 million | other | admin | 2004-12-31 | #677 |
| ELA Public Improvement Bonds 2006 authorization ceilingother | $575 million | ceiling | commitment | 2005-08-01 | #681 |
| Hacienda TRANs principal ceiling (Ley 139-2005)other | $1.5 billion | ceiling | admin | 2005-11-09 | #682 |
| Sec. 936 possessions tax credit claimed (peak 1993)GAO | $5.8 billion | subsidy | completed | 1993-12-31 | #668 |
| Sec. 936 possessions tax credit claimed (2003)GAO | $1.1 billion | subsidy | completed | 2003-12-31 | #668 |
| Hacienda tax debt receivables reported (2009)other | $3.8 billion | other | admin | 2009-05-21 | #640 |
| Hacienda unremitted employer withholdings (UTH claim)other | $1.5 billion | other | admin | 2009-05-21 | #640 |
| ELA structural deficit estimate (~$2B, Feb 2005)other | $2 billion | other | admin | 2005-02-24 | #676 |
| ELA public debt stock (Sept 2004)other | $38 billion | other | completed | 2004-09-30 | #676 |
| BGF loan in GDB FY2005 deficit estimateother | $550 million | other | commitment | 2005-02-24 | #676 |
| BGF/Turismo Condado Vanderbilt loan approvalother | $62 million | awarded | commitment | 2009-10-28 | #641 |
| APP Authority initial BGF credit line (P.S. 469 / Ley APP)other | $20 million | ceiling | admin | 2009-06-01 | #642 |
| Metropistas APP concession payment to Governmentother | $1.1 billion | other | completed | 2011-09-22 | #620 |
| Metropistas concession capex commitment (40 years)other | $600 million | other | pipeline | 2011-09-22 | #620 |
| Pre-PROMESA Commonwealth annual structural deficit (FY2021 plan cite)FOMB | $7 billion | other | admin | 2021-04-23 | #513 |
| FOMB FY2021 plan broadband incentive assignmentFOMB | $400 million | other | pipeline | 2021-04-23 | #513 |
| PREPA legacy debt obligations (May 2017, FY21 plan)FOMB | $9 billion | other | admin | 2017-05-01 | #515 |
| PREPA pension liability (May 2017, FY21 plan)FOMB | $4.3 billion | other | admin | 2017-05-01 | #515 |
| PREPA FEMA PA Global Settlement (FY21 plan cite)FOMB | $10.7 billion | other | commitment | 2021-05-27 | #515 |
| Ley 7 OPERA declared deficit targetother | $3.2 billion | other | admin | 2009-03-09 | #637 |
| Retirement systems shortfall (CPI 2008)other | $9.96 billion | other | admin | 2008-10-21 | #645 |
| Retiro pensioners federal suit damages claim vs UBSother | $800 million | other | fraud | 2011-10-11 | #618 |
Citations for this page live on Sources (Money / funds section). Each fund in the ledger still links to its document. See sources.